Elbe Klinikum, Stade
New construction of the "Somatik" building
Location
Bremervörder Straße 111, 21682 Stade
Construction year2017 — 2020
Project descriptionCombined reinforcement for the foundation slab of a new building for the Elbe Clinic in Stade.
Optimisation with SFRC
-
The construction process was sped up due to the use of combined reinforcement
-
Optimisation/reduction of the slab thickness by 20 cm compared to the original solution
- Reduction of the crack width-limiting reinforcement by more than half -> Optimal constructability/economic aspect
Slab thickness
95 cm
Executioncombined reinforcement
ConcreteC30/37
Performance classL2,1/2,1
Fibre typeDramix® 5D 65/60BG
Owner
Elbe Kliniken Stade Buxtehude GmbH, Stade
Original solution3Ki GmbH, Langestraße 54, 70174 Stuttgart
Floor area2.610 m²
Cubatureca. 2.500 m³