MAHOU Cervezas, Spain
Clad-Rack warehouse for MAHOU Cervezas
Madrid, Spain
Construction year2025
Project descriptionIn Madrid, Spain, the Mahou Cervezas brewery underwent a major expansion. Unlike conventional warehouse structures, the racking system not only supports the stored goods but also carries the entire building envelope. This makes the floor slab a critical load-bearing foundation. The slab must be rigid and comply with extremely tight rotational limits. Lastly, the warehouse is also fully integrated with advanced automation technologies.
- Optimisation of slab thickness -> Economic aspect
- Simplification of the reinforcement layout
- Designing a 185-meter-long, jointless exterior slab
45cm
ExecutionEdge thickening to 60 cm, combined reinforcement
ConcreteC30/37
Dosage30 kg/m³
Fibre typeDramix® 4D 65/60BG
Mahou Cervezas
General contractorEIGO Construcciones, S. L.
Floor areaca. 8.325 m²
Cubatureca. 5.000 m³