Photo: TSL

Symmetry Park, Kettering

Construction of a jointless industrial floor

Location

Pytchley, Kettering NN14 1FQ, UK

Construction year

2025

Project description

Construction of a jointless industrial floor with approx. 38,000 m² area and slab thickness between 25 – 40 cm at Symmetry Park, Kettering.

Optimisation with SFRC
  • Due to high loads from shelving systems

 

  • To accelerate the construction process

 

  • To significantly reduce slab thickness and the amount of conventional reinforcement
Slab thickness

25 – 40 cm

Execution

combined reinforcement

Concrete

C32/40

Dosage

30 kg/m³

Fibre type

Dramix® 4D 65/60BG

Owner

Tritax Symmetry

General contractor

TSL

Floor area

ca. 38.000 m²