Zeiss Norditalien, Oberkochen 2024
Zeiss Northern Italy, Bergamo + Mailand
Carl-Zeiss-Straße, 73447 Oberkochen
Construction year2024
Project descriptionAnother expansion of the large Zeiss campus in Oberkochen was carried out under the project name Zeiss Norditalien. As with the previously constructed production halls for semiconductor products, massive, jointless foundation slabs with a thickness of 1.50 meters were used. The implementation—consistent with earlier foundation slabs—featured hybrid reinforcement, ensuring that the efficient construction method was continued seamlessly in these new building phases.
- Fast-track construction was a top priority to enable the earliest possible start of production
- Vibration-resistant, monolithic foundation slabs
- Shortened execution time was a key factor
- Simplified reinforcement layout
- Continued the proven approach of using hybrid reinforcement for efficient construction
150cm
Executioncombined reinforcement
ConcreteC25/30
Performance classL1,8/1,8
Fibre typeDramix® 4D 65/60BG
Carl-Zeiss AG, 73447 Oberkochen
General contractorGLASS GmbH BAUUNTERNEHMUNG
Original solutionaitp GmbH, 09111 Chemnitz